Eot Crane Installation Procedure

Eot Crane Installation Procedure 7,1/10 9278reviews
Eot Crane CompanyTower Crane Installation

Quick Tips #107 A crane is a machine used for lifting and lowering a load and moving it horizontally, with the hoisting mechanism an integral part of the machine. Overhead cranes are used in many industries to move heavy and oversized objects that other material handling methods cannot. Overhead cranes have a railed support structure, known as a bridge, and a wheeled trolley that travels across the bridge horizontally. The other primary component of an overhead crane is the hoist, that’s attached to the trolley, and is used to perform the lifts. Several varieties of overhead cranes exist including, semi-gantry, cantilever gantry, storage bridge and wall cranes. OSHA regulates overhead crane safety through. This regulation covers general requirements, design, inspection, maintenance requirements and operations.

We shall be discussing here only the Electric Overhead Traveling (EOT) Cranes. Installation is quicker and runway beams cost less due to the lighter crane. EQUIPMENT USED FOR INSTALLATION Pallot Trolley – 2 Nos Chain Block -2 Ton – 1 No Lifting Slings Hand Tools PROCEDURE OF INSTALLATION: The. Electric Overhead Traveling (EOT) Cranes and Hoists Course Content. Installation is quicker and runway beams cost less due to the lighter crane dead weight.

• All overhead and gantry cranes installed after August 31, 1971, must meet the specifications of the American National Standard Institute (ANSI) / American Society of Mechanical Engineers (ASME) Safety Code for Overhead and Gantry Cranes, ANSI B30.2 • Cranes can be modified and load capacity rerated as long as the modifications and associated structure is thoroughly checked for the new rated load by a qualified engineer or the equipment manufacturer • The rated load of the crane must be plainly marked on each side of the crane. If more than one hoist is present, each hoist must have its rating shown • Clearance must be maintained above and to the side of cranes. Walkways cannot be placed in a crane operating zone that would compromise employee safety when the crane is in operation. Parallel cranes must have adequate clearance between the two bridges if no walls or structures are between them • Only designated personnel will be permitted to operate a crane. Inspection Requirements Due to the large and heavy objects often being transported by overhead cranes, routine inspections are necessary to ensure continued operation and overhead crane safety.

An initial inspection of the crane (new or altered) prior to initial use is necessary. Once placed into service, overhead cranes will require two different types of inspections.

Frequent inspections are done at daily to monthly intervals, while periodic inspections are completed at monthly to annual intervals. The purpose of the two inspection types is to examine critical components of the crane and to determine the extent of wear, deterioration or malfunction. • Deformed, cracked or corroded members • Loose bolts or rivets • Cracked or worn sheaves and drums • Worn, cracked or distorted parts, such as pins, bearings, shafts, gears, rollers, locking and clamping devices. • Excessive wear on brake-system parts, linings, pawls and ratchets • Inaccuracies in load, wind and other indicators • Electric or fossil fuel motors • Excessive wear of chain drive sprockets and excessive chain stretch • Deteriorated electrical components, such as pushbuttons, limit switches or contactors In addition to the initial inspection, OSHA also requires that all new and altered cranes are tested.

The operational testing includes the following. Maintenance Requirements A preventive maintenance program based on the crane manufacturer's recommendations must be implemented. Avo Multi-amp Pulsar Manual. If any deteriorated components or unsafe conditions are detected during the required inspections, they must be completed before the crane is allowed to be used. Only designated personnel may perform the required maintenance and repairs. The requirements of, the control of hazardous energy or lockout/tagout, should be used to de-energize the crane (See for more information). Find even more information you can use to help make informed decisions about the regulatory issues you face in your workplace every day.

Digi Reload Coupon Hack Generator Tool. View all Quick Tips Technical Resources at www.grainger.com/quicktips. Think Safety. Think Grainger. ® Grainger has the products, services and resources to help keep employees safe and healthy while operating safer facilities. You’ll also find a network of safety resources that help you stay in compliance and protect employees from hazardous situations. Count on Grainger for lockout tagout, fall protection equipment, confined space products, safety signs, personal protective equipment (PPE), emergency response and so much more! Please Note: The information contained in this publication is intended for general information purposes only and is based on information available as of the initial date of publication.